Please use this identifier to cite or link to this item: https://dr.ddn.upes.ac.in//xmlui/handle/123456789/3695
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSobti, Sameer-
dc.date.accessioned2022-02-11T10:40:12Z-
dc.date.available2022-02-11T10:40:12Z-
dc.date.issued2019-10-
dc.identifier.citationUnder the guidance of Mr. Pankaj Kapoor, Associate Vice President (O&M), AD Hydro Power Ltd.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/3695-
dc.descriptionSubmitted in partial fulfillment of the requirement for the degree of MBA (Power Management)en_US
dc.language.isoenen_US
dc.publisherCollege of Management and Economics Studies, UPES, Dehradunen_US
dc.subjectDissertationen_US
dc.subjectBusiness Administrationen_US
dc.subjectPower Managementen_US
dc.subjectHydro Power Planten_US
dc.subjectWater Inflow Forecastingen_US
dc.subjectWater Load Forecastingen_US
dc.subjectDeviation Settlement Mechanismen_US
dc.titleMaximizing the generation profit of runoff river hydro power plant considering the operations limitation i.e. water inflow forecasting and load forecasting while hedging against CERC regulationen_US
dc.typeThesisen_US
Appears in Collections:Post Graduate

Files in This Item:
File Description SizeFormat 
500065977.pdf5.67 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.